Front-End Engineering Before the Capital Budget Is Set

Most plant capital numbers are a material quote and a guess. Front-end engineering builds the capital budget from the plant as it actually stands.
Compressed Air System Retrofit

A $1M+ air-dryer upgrade wouldn’t fit the compressor room. A laser-scanned digital twin let us test six layouts virtually — installed a week early, with zero downtime and no field rework.
Crusher Feed Chute Retrofit

Scan-driven engineering and DEM simulation replaced a crusher feed chute with no reliable drawings — validating 1,400 TPH wet-coal flow so it fit the first time and loaded the rotor evenly.
Coal Transfer Tower Retrofit

How scan-driven engineering de-risked a $10,000-per-minute coal transfer tower retrofit — routing two independent transfer paths through six congested floors with less than an inch to spare.
Temporary Valve Support System

Laser scanning and pipe stress analysis behind a temporary valve support plan that kept a high-energy piping system safe and stable during a plant project.
Freeze Protection Curtain Design

High-accuracy scanning plus in-house engineering and PE-stamped drawings for freeze protection curtains across five shelter locations at a Georgia power plant.
Material Transfer System Modification

Scan-driven design engineering and material testing to cut drop height and impact forces at a critical transfer point — reducing product breakage and improving flow.
Fuel Gas Heater & Isolation Valve Removal

A full engineering package — cut planning, temporary supports, and CAESAR II stress analysis — for the safe removal of uncommissioned high-energy fuel gas heaters and valves.
Bunker Discharge Chute Redesign

Scan-based design engineering, fabrication, and installation support to eliminate chronic coal pluggage in bunker discharge chutes at a power plant.