The challenge
A coal-fired power facility needed to replace the crusher feed chute in an existing coal-handling system — with no reliable drawings for the critical connection geometry, limited field access to measurement points, and a dense brownfield environment of structural steel, grating, and equipment at tight clearances. The existing chute loaded the crusher rotor unevenly, concentrating wear. The replacement had to fit the first time inside a constrained outage and perform better than what it replaced.

The approach
AsBuilt — Acensium’s scan-and-model division — laser-scanned the head-chute-to-crusher area, capturing structural steel, equipment, chute geometry, tie-in points, and clearances. From that verified data Acensium engineers built an as-built model and coordinated the retrofit design against real field conditions with scan-driven engineering — validating routing, confirming clearances, and sizing support steel before fabrication.




We simulated 1,400 tons-per-hour of wet coal through the redesigned chute with DEM flow simulation, tuning geometry to keep material sliding rather than free-falling and to spread it evenly across the crusher rotor inlet. Before shipment, fabricated sections were checked against the 3D model with fabrication verification — flange orientation, bolt-hole alignment, section geometry, and connection points — so nothing was discovered in the field.




What we delivered
- Laser-scan capture and registered point cloud of the crusher-feed area
- 3D as-built model and coordinated retrofit chute design
- DEM flow simulation of 1,400 TPH wet coal
- Fabrication verification of chute sections before shipment
- Bypass-gate and access features for long-term maintainability
Results
- Fit the first time — flange geometry and connection points validated pre-installation; no field adjustment required.
- Better crusher loading — redesigned chute spread material evenly across the rotor inlet, reducing concentrated wear.
- Lower outage risk — routing, clearances, and tie-ins coordinated before the window opened.
- Easier to maintain — added access and a bypass gate for long-term operations.

Related Work & Further Reading
- Coal Transfer Tower Retrofit — a six-floor, $10K/minute transfer-path redesign driven by the same scan-to-fabrication workflow.
- Bunker Discharge Chute Redesign — eliminating chronic coal pluggage at the bunker discharge.
- How to Redesign a Transfer Chute That Keeps Plugging — the engineering approach behind projects like this one.
Explore the services behind this project: DEM Simulation, Scan-Driven Engineering, Fabrication Verification, Fabrication & Installation Support, and Bulk Material Handling.
Planning a crusher or chute retrofit?
Acensium and AsBuilt help industrial teams replace high-wear equipment that fits the first time — capturing existing conditions, validating flow with DEM, and verifying fabrication before it ships. Talk to Acensium about your next retrofit. Start the conversation →