The Challenge
Acensium — with reality capture by its partner AsBuilt — was contracted to provide design engineering, fabrication, and installation support for multiple bunker discharge chutes at a power plant. The existing chute configurations included features that caused frequent coal pluggage during discharge to the feeders, negatively impacting reliability and operations.
The scope required redesigning the discharge chutes, procuring fabricated components, and ensuring proper integration with existing bunker discharge structures — without introducing new flow or fitment issues.
The Solution
AsBuilt conducted a detailed 3D laser scan of the bunker discharge areas, capturing all relevant structural, equipment, and utility conditions. The scan data provided accurate as-built geometry to support chute redesign and interface detailing.
Using the scan-based models, Acensium’s engineering team applied scan-driven engineering to develop a comprehensive fabrication and installation support package. This ensured the new discharge chutes and associated hardware were accurately designed, properly fabricated, and aligned precisely with existing bunker discharge openings and feeders.
Key Outcomes
- Elimination of pluggage-causing features — Redesigned chute geometry improved material flow and reduced operational interruptions.
- Accurate fit with existing infrastructure — Scan-based design ensured new chutes integrated cleanly with existing bunkers and feeders.
- Fabrication-ready documentation — Detailed design packages supported efficient fabrication and installation.
- Reduced installation risk — Accurate as-built data minimized field modifications and rework.
Deliverables
- Design engineering
- Fabrication support
- Installation support
Why It Matters
Bulk material handling issues like chute pluggage can significantly impact plant reliability. By combining accurate reality capture with engineering-led design and fabrication support, Acensium delivered a durable solution that improved system performance and reduced operational risk.
Related Work & Further Reading
- Coal Transfer Tower Retrofit — a six-floor, $10K/minute transfer-path redesign driven by scanning, DEM, and fabrication QA.
- Crusher Feed Chute Retrofit — a scan-driven crusher feed chute replacement that fit the first time.
- How to Redesign a Transfer Chute That Keeps Plugging — the engineering approach behind projects like this one.
Explore the services behind this project: Scan-Driven Engineering, Fabrication & Installation Support, DEM Simulation, and Bulk Material Handling.
Fighting chronic chute pluggage?
Acensium redesigns discharge and transfer chutes from verified as-built conditions so material keeps moving and new equipment fits the existing structure. Talk to Acensium about your material-handling problem. Start the conversation →