Compressed Air System Retrofit

A $1M+ air-dryer upgrade wouldn’t fit the compressor room. A laser-scanned digital twin let us test six layouts virtually — installed a week early, with zero downtime and no field rework.
Crusher Feed Chute Retrofit

Scan-driven engineering and DEM simulation replaced a crusher feed chute with no reliable drawings — validating 1,400 TPH wet-coal flow so it fit the first time and loaded the rotor evenly.
Coal Transfer Tower Retrofit

How scan-driven engineering de-risked a $10,000-per-minute coal transfer tower retrofit — routing two independent transfer paths through six congested floors with less than an inch to spare.